People talk about "PSM procedures" as if the phrase were self-explanatory. The requirement is specific. 29 CFR 1910.119(f) tells an employer what a written operating procedure for a covered process has to contain, how available it has to be, and how it stays current. 40 CFR 68.69 is the parallel rule for an EPA Risk Management Program process in Program 3. This is a reading of those sections for people who write the pages. It is not a compliance opinion for any facility, and it is not a substitute for the text.

Clear instructions, consistent with the process safety information

Both rules open the same way. The employer, or under the RMP rule the owner or operator, shall develop and implement written operating procedures that provide clear instructions for safely conducting activities involved in each covered process, consistent with the process safety information.

Two words do most of the work. "Clear" means an operator can carry the instruction out without inventing the missing half. "Consistent with the process safety information" means the limits, the chemicals, the equipment, and the safety systems in the procedure are the ones in the PSI, not a parallel set of numbers that grew up in the procedure file. If the PSI and the procedure disagree, you do not have a style problem. You have a conflict to resolve before the page is issued.

The operating phases

1910.119(f)(1)(i) requires steps for each operating phase. The phases are listed:

40 CFR 68.69(a)(1) lists the same seven phases in the same order, with the same sentence on emergency shutdown.

A procedure set that covers normal operations and normal shutdown, and treats the other five as "see the emergency plan" or "use judgment," has not addressed the list. Temporary operations are part of the list. So is startup after a turnaround, which is not the same document as initial startup. Emergency shutdown is not a cross-reference. The text asks for the conditions that require it, and for which qualified operators are responsible.

The phases are not seven copies of the same procedure with the title changed. Initial startup includes lineups and checks that a routine start does not. Emergency operations are what trained people do when the process is in an upset, which is a different sequence from shutting it down. Write the phase you named.

Operating limits, consequences, and the corrective step

1910.119(f)(1)(ii) and 68.69(a)(2) require operating limits: the consequences of deviation, and the steps required to correct or avoid deviation.

A limit without a consequence is a number. A consequence without a step is a warning. The rule asks for all three. On the page, they belong where the operator compares the reading to the limit. "Header pressure: 40 to 60 psig, as stated in the process safety information. Below 40, the downstream unit loses feed. Above 60, the relief path lifts. If pressure is outside the range, take the corrective step named here or stop and notify the supervisor." That is the shape. The numbers have to be your numbers, taken from your PSI. The example is a shape, not a limit to copy.

Do not bury the limit in a table the step does not point to by name and location. Do not write "see SOP-012 for limits" unless SOP-012 is the procedure in the operator's hand. A cross-reference that takes a search is not a clear instruction.

Safety and health considerations

1910.119(f)(1)(iii) and 68.69(a)(3) require safety and health considerations:

This is the part most often pasted in from a safety data sheet and then never tied to a step. The hazard information has to be available. It also has to show up where the operator can be exposed: which protective equipment before breaking a line, what to do if the detector alarms, what "inventory" means for the containers in this process. A two-page chemical summary at the front, and steps that never mention it, does not connect the requirement to the work.

Safety systems and their functions

1910.119(f)(1)(iv) requires safety systems and their functions. 68.69(a)(4) requires the same, and adds a Program 3 point the OSHA text does not. 68.69(a)(4) also requires documentation when monitoring equipment associated with prevention and detection of accidental releases from covered processes is removed due to safety concerns from imminent natural hazards. That clause was added by the March 11, 2024 RMP amendments (89 FR 17689) and is in the current text of 68.69. EPA has since proposed further revisions to the 2024 rule (91 FR 8970, Feb. 24, 2026); check the current eCFR text when you write the page. Do not assume the two sections are word-for-word copies. If you are writing only to the OSHA text, do not ignore this sentence where Program 3 also applies.

On the page, name the system where the operator depends on it. "Confirm the scrubber is in service and the room beacon is dark before you open the door" is a safety-system step. "The unit is equipped with various safety systems" is not.

Accessible, current, and certified

1910.119(f)(2) and 68.69(b) require the procedures to be readily accessible to employees who work in or maintain the process. Accessibility includes the night shift, the contractor who is about to open a line, and the copy that is not locked in a supervisor's office.

1910.119(f)(3) requires review as often as necessary so the procedures reflect current practice, including changes in chemicals, technology, equipment, and facilities, and an annual certification that the procedures are current and accurate. 68.69(c) is the owner-or-operator version of that duty. Neither section prescribes a form. Both require the certification to mean something: current, and accurate.

1910.119(f)(4) and 68.69(d) require safe work practices for hazards during operations such as lockout/tagout, confined space entry, opening process equipment or piping, and control of entry by support personnel. Those practices apply to employees and to contractor employees. They sit next to operating procedures. They do not replace the operating phases.

If a change covered by management of change affects the procedures, 1910.119(l)(5) says the procedures shall be updated accordingly. The annual certification is not the first time a changed valve is allowed to appear in the text.

Use the sections. Link them. Then write the page so an operator can do the phase that is named, inside the limits the process safety information already states, with the safety systems the step depends on.

Greg Prichard is the principal of Critical Path Procedures LLC. He writes operating procedures for water, wastewater, and chemical facilities. The facility's own experts approve the procedures, and the facility performs its own annual certification. This article is general information, not legal advice.