Water and wastewater plants use chlorine and ammonia because the treatment process needs them. Some of those systems are covered by OSHA PSM, some by the EPA Risk Management Program, some by both, and some by neither. The chemical, the concentration, and the quantity decide coverage. I am writing about the procedure gaps that show up once a system is covered. I am not saying every utility is covered, and I am not quoting an audit rate. I have not seen a published count I would stand behind, so this page does not invent one.

Read the threshold lists

29 CFR 1910.119(a) applies the OSHA standard to a process which involves a chemical at or above the threshold quantities in Appendix A. In that appendix, chlorine is listed at 1,500 pounds. Anhydrous ammonia is listed at 10,000 pounds. Ammonia solutions greater than 44 percent ammonia by weight are listed at 15,000 pounds. Those are different rows. A procedure that says "ammonia" and does not say which form is in the process does not match the process safety information.

40 CFR 68.130 is EPA's list. Chlorine is listed at 2,500 pounds. Anhydrous ammonia is listed at 10,000 pounds. Ammonia at a concentration of 20 percent or greater is listed at 20,000 pounds. 40 CFR 68.10(a) speaks of a stationary source that has more than a threshold quantity in a process, determined under 40 CFR 68.115. OSHA says "at or above." EPA says "more than." For chlorine, the listed quantities are different numbers. Use each sentence as written.

Program 1, 2, and 3

Under 40 CFR 68.10(j), a covered process is eligible for Program 1 if it meets the criteria in that paragraph. 40 CFR 68.10(l) places a covered process in Program 3 if it does not meet those Program 1 criteria and if either it falls in one of the NAICS codes listed in 68.10(l)(1) or the process is subject to the OSHA PSM standard, 29 CFR 1910.119. Water and wastewater treatment are not those NAICS codes. A utility process is Program 3 when it is a covered RMP process and it is also subject to 29 CFR 1910.119. Operating procedures for Program 3 are in 40 CFR 68.69. A covered process that is neither Program 1 nor Program 3 falls under Program 2. The operating-procedure section there is 40 CFR 68.52. That is a different text. The word "utility" does not tell you which one to write.

As printed, 68.10(l) still refers to "paragraph (g)," and 68.10(k) still refers to "paragraph (g) or paragraph (i)." Those paragraphs are now compliance dates from the 2024 amendments. The Program 1 eligibility criteria are in 68.10(j). Use the criteria in (j), not the dates in (g) or (i).

The phases that come back thin

Where the process is covered, 1910.119(f)(1)(i) and, for Program 3, 68.69(a)(1) require steps for each operating phase.

Normal feed is usually written. Temporary operation often is not. Changing a cylinder, switching ton containers, or feeding from a spare evaporator is temporary operation or normal operation, depending on how the plant runs it. If the crew does it from memory, that phase is missing from the book.

Emergency shutdown is the phase the text is most specific about. The procedure has to include the conditions under which emergency shutdown is required, and the assignment of shutdown responsibility to qualified operators. "Shut the feed down in an emergency" does not name the condition. Use the conditions in the process safety information and the emergency plan: a detector alarm, a visible release, a scrubber that is not in service, a container valve that will not close. Say who shuts the system down. If the only person who knows is the one who has done it before, the responsibility is not in the procedure.

Startup after maintenance or after an emergency shutdown is its own phase. The checks that matter after a line has been open, or after a release, belong there. Emergency operations, if people stay to run equipment during an upset, are a different sequence from walking away and shutting down. Write the sequence the plant will actually perform.

Limits and safety systems on the step

Container pressure, feed rate, residual, alarm setpoints, and scrubber flow are often already written down somewhere. 1910.119(f)(1)(ii) and 68.69(a)(2) also want the consequences of deviation and the steps to correct or avoid deviation. A feed-rate limit with no statement of what happens below it or above it is an incomplete element. Take the number from the process safety information. A round number chosen because it fits the sentence is not the limit.

Detectors, automatic shutoff, and a scrubber are the safety systems I see on these processes. 1910.119(f)(1)(iv) and 68.69(a)(4) require safety systems and their functions. Put the function on the step that depends on it. Confirm the scrubber is operating before a container is hooked up, if that is the control the PSI relies on. Confirm the detector is in service before the room is entered, if entry depends on it.

68.69(a)(4) also requires documentation when monitoring equipment associated with prevention and detection of accidental releases from covered processes is removed due to safety concerns from imminent natural hazards. That clause was added by the March 11, 2024 RMP amendments (89 FR 17689) and is in the current text of 68.69. EPA has since proposed further revisions to the 2024 rule (91 FR 8970, Feb. 24, 2026). Check the current eCFR text when you write the page. If Program 3 also applies, include that sentence even if you started from the OSHA text.

Name the chemical that is actually there

For these chemicals, inventory the operator can act on is which containers are connected and which are in storage. Say anhydrous or aqueous, and say the strength the PSI uses. Ammonia solutions are listed apart from anhydrous ammonia, at different concentrations and different quantities, in both Appendix A and 40 CFR 68.130. Mixing the names produces a procedure that does not match the process safety information.

Write the phase the crew performs, including container changes and emergency shutdown. Put the limit, the consequence, and the corrective step on the step. Name the safety system where the operator has to know its state. Decide coverage from the lists and from 68.10.

I write operating procedures for water, wastewater, and chemical plants. Your experts approve the procedure. Your facility does its own annual certification. This article is general information, not legal advice.